Every commercial bid starts with a sheet-by-sheet review of the engineer's set: what is missing, what conflicts, what goes to the GC as a question before bid day.

Plan review

Every sheet,
read before we price.

We mark the mechanical set against the schedules, notes and the other trades. Anything missing or in conflict becomes a question to the GC or a line in our scope, before bid day.

RedMissing from the drawings or the scope. Goes to an RFI.
OrangeField condition or coordination with another trade.
GreenConfirmed against the schedule and counted in the takeoff.
Blue / grayDemolition, access and existing conditions.
  1. 01

    Read the set

    Mechanical, architectural, structural, plumbing and electrical sheets, plus specs and addenda.

  2. 02

    Mark the plan

    Each note tied to the sheet where it appears, color-coded by what it needs.

  3. 03

    RFIs

    Questions sent to the GC before bid day, not after award.

  4. 04

    Takeoff

    Equipment, duct, fittings, grilles, dampers, insulation and controls counted from the drawings.

  5. 05

    Quotes

    Written supplier quotes for each package, matched to the takeoff.