What's prepared
✓
Plan review and scope definition against your construction documents.
✓
Plan-specific ACCA Manual J, S and D design.
✓
Plan-specific gas piping design and sizing.
✓
Matched equipment selections.
What you receive
○ At bid
A written, line-item bid with inclusions, clarifications and exclusions, referenced to the plan sheets and code sections it's based on, and priced by your phases and cost codes.
○ Before ordering
The design and submittals for your review.
○ On production plans
A mock-up of the first home to catch design and trade conflicts before the plan repeats.
Coordination points
Framing, plumbing and electrical, including backing, chases and penetrations.
Notes for the GC
In the complete system

Conceptual diagram of where this scope sits in the coordinated mechanical system. Not a DML project.
Send the plan set.
Plans, the bid due date and the scope you need priced.
